--- Epcos Power Factor Controller Br 5016 Manual Pdf
Based on official documentation and technical specifications, follow these steps for setup:
Connect the measuring voltage terminals to the phases (e.g., L2 and L3). Ensure the voltage matches the device variant specifications.
Cut a standard panel opening according to the dimensions in your data sheet (typically 138mm x 138mm). --- Epcos Power Factor Controller Br 5016 Manual Pdf
Program higher THD thresholds if safe, or install harmonic detuning reactors in series with the capacitors.
The EPCOS engineers explicitly warn against these errors: Program higher THD thresholds if safe, or install
True RMS monitoring of voltage, current, and harmonics.
Enter the primary value of your Current Transformer (e.g., if using a 500/5A CT, set the value to 500). Target Cos Target Cos Connected to the phase conductors (or
Connected to the phase conductors (or phase-neutral depending on system configuration).
Regular maintenance prevents unexpected downtime and extends the operational lifespan of the power factor correction system. Periodic Maintenance Checklist Visual inspection of the BR5016 display for active alarms.
Input the primary and secondary current of your CT (e.g., 500/5A or 1000/5A).